Attach the door handles and any towel bars.
Tile shower door installation.
Use a small amount of the excess mortar and spread it onto the back of a tile with the notched.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
Place end caps on the tops of the wall channels.
Clean the tile surface with a household cleaner to remove any film or dirt from the tub ledge and tile surfaces.
If you want fancy glass tile accents like the ones we show brace yourself.
Attach the seal strip to the bottom of the door and cut it to the required length.
Use a hacksaw to.
Tap a plastic anchor into the pre drilled holes in the tile image 3.
How to install shower doors on tile step 1.
Continue reading below our video of the day.
How to tile a shower like we show here will take you about four full days.
Drill proper holes into the walls for the side rails.
Make a mark on the tile for the spots where you will be drilling.
Put it in place and tape it down until the side rails are in place image 2.
Measure the inside width of the shower at the top surface of the tub ledge from wall to wall.
Run a bead of silicone on the underside of the threshold piece image 1.
Shower tile and shower tiling supplies will cost about 600 if you choose standard tile.
Spread thin set along the first section of your tile row.
Run a damp sponge over the backer board in the area you intend to tile.
Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp.
The shower tiling alone will take two days.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.